Skip to content

Case Study: RMR® – BP, Caspian Sea

Problems with shallow formations forced BP to abandon its West Azeri template in the Caspian Sea. In order to prevent similar problems, Enhanced Drilling provided BP with Riserless Mud Recovery (RMR®) services. In this case study you can read more about the provided RMR system, as well as the experienced benefits of this solution. 


  • CHALLENGE: Top Hole stability & Loss of Template

  • SOLUTION: Riserless Mud Recovery (RMR®) system

  • RESULTS: Reduce risk in drilling and improved safety. The solution became the new standard operating procedure for BP’s wells in the area

Download your Case Study here

Enhanced_Drilling_RMR_case_study_1-LOREM IMPSUM