Skip to content

Case Study: MPC® BP, Caspian Sea

Presence of high-pressure shallow water and gas in the Caspian region, notorious for its unconsolidated formations, had previously imposed a lot of costs on BP. Learn how MPC® was vital in enabling BP to achieve effective top-hole cementing.


  • CHALLENGE: Succesful isolation of unconsolidated sands.

  • SOLUTION:  MPC® enables the management of wellbore pressure in such a way that unwanted fluid exchanges between the wellbore and casing annulus are avoided during the circulation of cement slurry and its setting time.

  • RESULTS: MPC® was vital in achieving effective top-hole cementing. With all the features inherent within the system, the cement slurry was placed with minimal risk of loss and flow.

Download your Case Study here

lorem ipsum of MPC case study 2